G. S. Wark was awarded the New Plant Addition design build contract in Welland, Ontario with Hydac Corporation in June of 2015 . This project is design-build and includes a 13,000 square foot pre-engineered building with crane extension to an existing system.

 

A drive-in bay feature is designed to accommodate loading logistics.   The project will commence immediately and is scheduled for completion in January of 2016.